    Introduction | The Challenge
    Justification for Different Groupings: Project Management Hierarchy | Industry/Product Sectors
    Internet Research | Taming the Long List of Industry Sectors
    Significant Difference in Types of Output | Putting "Work" and "Product" Together
    Comments Regarding Appendix A | Summary of Our Deliberations

    Appendix A - Listings of Industry Sectors A through H

    Comments on the table as developed from the sources shown:

    1. Below each source document title in columns A through H is shown the number of discrete entries at the group level in the original source document.
    2. For simplicity in displaying the comparison between sources in the table, we have grouped a number of lesser industries together in a given column. Hence the number of occupied rows is less than the original number shown at the top.
    3. Note that the entries in column A through H are themselves headings that cluster numerous similar project management Areas of Application, so that the Table as a whole covers the whole area of potential project activity.
    4. Column I contains our suggested representative term for each row in question.
    5. Column J identifies the general category of the row according to one of the four types, 1 through 4, displayed in the Basic 2x2 Project Classification table according to Figure 2.
    6. Finally, the four that we feel are best representative of the industries in each of the categories are hi-lighted in yellow. This selection is based generally on the size of the industry in question and the extent of recognition of that industry in project management literature.

    Of course, our selection necessarily tends to be very subjective, especially as many industries engage in projects that range from simple maintenance to advanced research.

    Figure A1 shows Work Types 1 & 2 (click to enlarge)

    ** Healthcare and Public Services are two very large areas of administrative type projects involving similar type outputs.
    Note: Category Type 1 projects generally result in Craft/Tangible outcomes. Type 2 projects generally result in Craft/Intangible outcomes.

    Figure A2 shows Work Types 3 & 4 (click to enlarge)

    Note: Category Type 3 projects generally result in Intellect/Tangible outcomes. Type 4 projects generally result in Intellect/Intangible outcomes.


    Putting   Putting "Work" and "Product"
         Together

     

    Home | Issacons | PM Glossary | Papers & Books | Max's Musings
    Guest Articles | Contact Info | Search My Site | Site Map | Top of Page
  • 天和彩票注册

    腾博会诚信

    体即时比分球网网

    好运网站

    贝斯特官方网站

    新濠天地娱乐赌城网

    彩吧论坛首页彩票论坛

    皇冠足球足球比分

    好的优盛的彩的网的登陆网址